-
Key Installation
features -
Stretch ceiling does not require preparation and preliminary work, as in the case of standard coatings.
Â
Canvas are installed without construction debris, associated dust and dirt, and also does not require the mandatory removal of furniture and interior items.
Â
It does not take much time to install a stretch ceiling — all work can be completed in one day, including the installation of ceiling lighting.
Installation Scheme
-
Preparing the room for installation:
Cover walls and floors with protective material. -
Setting the level.
(at least 4 cm from the bottom of the room). -
Installation of profile systems and processing of joints, corners and junctions.
-
Installation of embedded platforms for chandeliers and lamps with cable laying.
(one of the most important steps, because the wiring and connection should be done according to the rules!). -
The canvas cut to size is unfolded indoors and fixed first in the corners of the room.
-
The suspended sheet is heated by heat cannon — heat causes the film to become soft and malleable.
-
After heating, the film is stretched and fixed by the fasteners.
-
Thermal sticker are glued onto the stretched canvas and lighting fixtures are installed.
-
Cleaning walls and floors from the protective material.





