Key Installation
features -
Stretch ceiling does not require preparation and preliminary work, as in the case of standard coatings.
Canvas are installed without construction debris, associated dust and dirt, and also does not require the mandatory removal of furniture and interior items.
It does not take much time to install a stretch ceiling — all work can be completed in one day, including the installation of ceiling lighting.
Installation Scheme
-
Preparing the room for installation:
Cover walls and floors with protective material. -
Setting the level.
(at least 4 cm from the bottom of the room). -
Installation of profile systems and processing of joints, corners and junctions.
-
Installation of embedded platforms for chandeliers and lamps with cable laying.
(one of the most important steps, because the wiring and connection should be done according to the rules!). -
The canvas cut to size is unfolded indoors and fixed first in the corners of the room.
-
The suspended sheet is heated by heat cannon — heat causes the film to become soft and malleable.
-
After heating, the film is stretched and fixed by the fasteners.
-
Thermal sticker are glued onto the stretched canvas and lighting fixtures are installed.
-
Cleaning walls and floors from the protective material.